SHEET 2 OF 8 · SERVICES · 43°36'55"N 116°12'07"W

Services

Surveying and civil engineering, done by the same people on the same floor. Typical scope, deliverables, timelines and what we need from you are set out below. Nothing here is a fixed price. Every job is quoted after we look at the parcel.

Service 01

Boundary and ALTA surveys

Property corners, title-grade

Retracement of deed and plat lines, corner recovery, monument setting, and ALTA/NSPS land title surveys for lenders and title companies. Most residential boundaries are two crew-days of field work and one of research.

Deliverables
Stamped record of survey filed with the county, set monuments, signed ALTA map with the Table A items you select.
Timeline
Residential boundary 7 to 12 business days from the field date. ALTA surveys run 3 to 5 weeks.
You supply
Parcel number, current deed, and for ALTA work the title commitment with exception documents. Access, and a gate code if there is one.
Service 02

Topographic and design surveys

The ground, measured once

One-foot contour topography with utilities, trees, structures and drainage features, plus route and corridor surveys for roads, pipelines and rail. Flown or walked, depending on cover.

Deliverables
DWG drawing, LandXML surface, PDF sheets, and a field book scan if the engineer wants it.
Timeline
5 to 10 business days for sites under 20 acres. Corridors are quoted by the mile.
You supply
Limits of the survey, the datum you want (NAVD88 unless told otherwise), and any engineer's CAD base.
Service 03

Construction staking

Stakes in before the excavator

Lot corners, curb and gutter, sewer and water lines, building pads and grade stakes. Three crews stake daily from March through November, and we keep a winter crew for frozen-ground layout.

Deliverables
Marked stakes with cut sheets, a staking report, and as-built verification on request.
Timeline
48 hours notice for routine staking. Same-week for urgent calls to the field line.
You supply
Approved plans and CAD files, access, and a call before you disturb the stakes. Re-staking after disturbance is billed hourly.
Twin railway tracks in a concrete cutting seen from above
Rail corridor in a concrete cuttingFig. 3
Service 04

Subdivision platting

From preliminary to recorded

Preliminary and final plats, lot line adjustments, condominium plats, and the county and city submittals that go with them. We have platted in Ada, Canyon, Elmore, Owyhee, Gem and Valley counties.

Deliverables
Final plat on mylar and PDF, monuments set, closure calculations, and a recorded instrument number.
Timeline
Final plat preparation 4 to 8 weeks, then the jurisdiction's own review time.
You supply
Approved preliminary plat, conditions of approval, and a current title report.
Service 05

Site grading and drainage

Stormwater that actually drains

Grading plans, retention and infiltration design, erosion and sediment control, and the drainage report that goes to the reviewer. Designed to Ada County Highway District and Idaho DEQ criteria.

Deliverables
Stamped plan set, drainage calculations, SWPPP, and review responses until sign-off.
Timeline
4 to 10 weeks depending on site size and agency queue.
You supply
A survey (ours or yours), the geotechnical report, and a site program that will not change next week.
Service 06

Road and utility design

Streets, mains and services

Local streets and subdivision roadways, water and sewer extensions, pressure irrigation, and the plan and profile sheets that highway districts and cities require.

Deliverables
Plan and profile sheets, specifications, quantity take-offs and an engineer's cost estimate.
Timeline
6 to 14 weeks. Agency submittals add 3 to 6.
You supply
Preliminary plat or site plan, utility locates, and the agency's standard details if they are not public.
Service 07

Drone mapping and volumetrics

Two licensed pilots, three aircraft

Orthomosaics at one-inch pixels, point clouds, contours and stockpile volumes, tied to surveyed ground control. Two FAA-licensed pilots and three aircraft, one carrying RTK.

Deliverables
GeoTIFF orthophoto, LAS point cloud, surface model, and a volume report with the method stated.
Timeline
Flight within 5 working days, weather permitting. Deliverables 3 to 5 days after flight.
You supply
Site access, stockpile limits, and notice if you are inside controlled airspace near the Boise airport.
Service 08

Water resources

Canals, ditches and floodplains

Canal and lateral realignment surveys, ditch easements, headgate and culvert mapping, and drainage studies. A group of three engineers and two survey techs who work on the irrigation calendar.

Deliverables
As-built and design surveys of ditches and structures, hydraulic analysis, plans, and easement descriptions.
Timeline
3 to 12 weeks, scheduled around the winter shutdown window.
You supply
District records and easements, the shutdown dates, and a contact at the district who can authorize access.

Turnaround

How long, and when it can go faster.

ServiceTypicalRush
Boundary and ALTA surveys7 to 12 daysYes, from 4 days
Topographic and design surveys5 to 10 daysYes, from 3 days
Construction staking48 hr noticeSame-week
Subdivision platting4 to 8 weeksNo, jurisdiction sets pace
Site grading and drainage4 to 10 weeksPartial, small sites
Road and utility design6 to 14 weeksNo
Drone mapping and volumetrics5 days to flyYes, weather permitting
Water resources3 to 12 weeksSeasonal

Times run from signed agreement and field access, not from first call. Frozen ground and fire closures can move field dates in winter and late summer.

Start a job

Tell us what you are building.

A site plan, a deed, even a photo of the fence line is enough to start. We will tell you what we need next.

Request a quote
1215 W Bannock Street, Suite 400
Boise, ID 83702
+1 (208) 555-0159
[email protected]